32” Gas Pipeline, Valves, and Connections Phase 1 |
 |
Engineering, Procurement, and Construction of 32” Gas Pipeline, Valves, and Connections Phase 1 - South Pars Gas field Development
Client:
|
Pars Oil & Gas Company (POGC)
|
Contract starting date:
|
September 2009
|
Contract completion:
|
Completed
|
Contract No.:
|
639-89-35
|
Location:
|
Asaluyeh - (Boushehr Province)
|
Pipelines diameters and lengths:
|
32 in, Inside Plant
|
The project comprises engineering, procurement, construction, installation, and commissioning for replacement of existing interconnecting 20” gas pipeline at phase 1 of south pars gas field with a 32” pipeline.
Pipeline diameter is 32” and approximate length is 150m and includes one insulating joint, one flow meter, one ESD valve, one check valve, and other materials and contains following sections:
- Engineering
- Surveying
- Detail engineering
- Field engineering
- Construction, installation, and commissioning drawings, procedures, and calculations
- Final documentation
- Precommissioning and commissioning engineering
- Managing coordinating with other companies and groups
- Material tracing system
- Procurement
- Preparation of purchase documents
- Preparation and submission of purchase orders after Client approval
- Material expediting
- Material insurances
- Material inspection by TPA and obtaining certifications from Client and TPA
- Packing
- Loading, transportation, unloading, and customs clearances (if applicable)
- Planning and control of all purchase activities
- Material storage
- Construction
- Construction of 32” pipeline
- Construction and installation of piping, valves, fittings, and instrumentation
- Commissioning
- Mobilization and Demobilization
|
|