Pipeline for Gas Gathering Station No. 2

 

30”Gas Transfer Pipeline for Gas Gathering Station No. 2 Tabnak Gas Field Development

 Client:

 Petroleum Engineering & Development Company (PEDEC)

 Contract starting date:

 May 2003

 Contract completion:

 Completed

 Contract No.:

 NTM-82-229

 Location:

 Tabnak Gas Field - (Boushehr Province)

 Pipelines diameters and lengths:

 30 in, 35 km

 

 

The project comprises delivery of produced gas from Tabnak Gas Field to the Parsian Gas Refinery approximately 35 Km apart all in the southern Iran. This gas is produced from 9 gas wells of the gas field.

The project area is almost totally mountainous with steep and in some parts very steep. The starting point of the pipeline is on the mountain and in these parts the soil texture is almost fully rock. In ending section of the pipeline, about 3.5 Km, it passes through a flat route of clay. The difference of elevation between lowest and highest points of the pipeline is around 820m.

In general the Work shall comprise procurement and haulage of materials to the site, provision of appropriate storage facilities, tools, supplies, machinery, labor and all other facilities required for construction, testing and commissioning of the pipeline system as defined in these documents.