Tabnak Gas Field Surface Facilities

 

Engineering, Procurement, and Construction of Tabnak Gas Field Surface Facilities Tabnak Gas Field Development

 Client:

 Petroleum Engineering & Development Company (PEDEC)

 Contract starting date:

 January 2002

 Contract completion:

 Completed

 Contract No.:

 MED-80161-ME01

 Location:

 Tabnak Gas Field - (Boushehr Province)

 Gas Field Surface Facilities:

 Pipeline 10”, 24”, 30”

 Wellhead Facilities

 Gas Gathering Unit

 

 

The project comprises the gas gathering from 14 gas well and delivery of produced gas from Tabnak Gas Field to the Parsian Gas Refinery approximately 30 Km apart all in the southern Iran. This gas is produced from 9 gas wells of the gas field.

The Work comprise the Engineering, Procurement and construction of 10 well head facilities, 14 No of 10” gas flow lines, a manifold and a 30” inch buried gas transportation line Tabnak Gas Field and ends at Parsian Gas Refinery (Parsian Gas Treatment Plant PGTP) sludge catcher area and a 24” inch buried gas transportation line from third manifold of Tabnak Gas Field and ends at a tie in point to the above mention 30” pipeline. Associated with poly ethylene factory applied coating, cathodic protection, etc.