10” Condensate Handling Pipeline Kangan

 

Construction of 10” Condensate Handling Pipeline Kangan Gas Refinery

 

 Client:

 National Iranian Oil Company (NIOC)

 Kangan Natural Gas Project

 Contract starting date:

 November 1987

 Contract completion:

 Completed

 Contract No.:

 98/KTGT

 Location:

 Kangan - Tahery (Boushehr Province)

 Pipelines diameters and lengths:

 10 in, 42 km

 

The project comprises delivery of condensate from the Vali’Asr (Kangan) Refinery to the storage tank area in the east of Bandar-e-Taheri, 40 kilometers south of refinery and loading to tankers via a S.P.M.

Total delivery will be 8448 m3/d condensate corresponding to Nar phase of Kangan Project as well.

Kangan Natural Gas Project will produce gas and will be dispatched to IGAT II for consumption. Condensate from refinery as by-product shall be disposed.  All condensate will be stabilized and transferred to two refinery storage tanks and then through a pump station will be sent to 10” pipeline condensate.

The work comprises the installation of a ten inch buried condensate transportation line form Vali’Asr Refinery to Bandar-e-Taheri storage Tank Area, associated with hot wrapping, cathodic protection, etc.