الاحد, ديسمبر 15, 2019
  • -
    -

  • -
    -

  • -
    -

  • -
    -

  • -
    -

16” Crude Oil Pipeline (2nd section)Tehran/Tabriz

Construction of 16” Crude Oil Pipeline (2nd section)Tehran/Tabriz

 Client:

 National Iranian Oil Company (NIOC)

 Tehran Engineering and Construction Department

 Contract starting date:

 March 1985

 Contract completion:

 Completed

 Contract No.:

 952CC

 Location:

 Tehran-Tabriz(Tehran-Zanjan-East Azarbeijan Provinces)

 Pipelines diameters and lengths:

 16 in, 250 km

 

The project comprises delivery of crude oil from the Rey Facilities neighboring Tehran Refinery to Tabriz Refinery, second section, the length is 250 Km. Total delivery will be 110,000 bbl/d crude oil received from the end facilities of 26” Ahwaz –Isfahan –Tehran Pipeline to increase the oil feed of Tabriz Refinery.

The pipeline is 16” and is located parallel to the existing 14” Tehran Tabriz pipeline with 5 m clearance and passes through Idaloo Pumping Station and Qarachaman Pumping Station. The pipeline ends at Tabriz Refinery receiving facilities.

The Work comprises the installation of a 16” buried crude transportation line form Idaloo Pumping Station 40 Km to the North West of city of Zanjan to the Tabriz Refinery Tank Farm. Associated with over the ditch coal tar enamel hot wrapping, cathodic protection