Unit 71&72 Bandar Abbas Gas Condensate Refinery |
 |
Construction of Unit 71 Underground and Aboveground Pipelines, Unit 72 Underground Pipelines - Bandar Abbas Gas Condensate Refinery
Client:
|
Persian Gulf Star Oil Company (PGSOC)
|
Contract starting date:
|
April 2013
|
Contract completion:
|
30% Progress
|
Contract No.:
|
240/3/1/312-2250
|
Location:
|
Bandar Abbas - Hormozgan
|
Pipelines diameters and lengths:
|
Different
|
The project comprises construction of underground and aboveground pipelines in Bandar Abbas gas condensate refinery, process units 71 & 72. The project is under construction with 30% progress.
Bandar Abbas Gas Condensate Refinery Project will refine 360,000 barrels South Pars gas condensates per day and will produce oil products according to Euro – Standard.
In general the Work shall comprise:
- Delivery and handling of pipes and other materials within the site.
- Trench excavation and bedding for the laying of underground networks (piping, cables, sleeves, etc.)
- Transporting of excavated material to the designated depot place
- Supply and transport of suitable backfill material into the site
- Prefab and pipe laying of carbon steel and galvanized pipelines; installation of valves and other material
- None destructive tests (NDT), destructive test and PWHT if needed
- Sandblast and cold wrapping with specified primer of carbon steel and galvanized pipes for UG pipelines; painting of carbon steel pipes for AG pipelines.
- Coating and wrapping of carbon steel and galvanized pipes at joints and related tests
- Leakage tests, hydrostatic tests, pipeline flushing, drying, and other required activities
- Trench backfilling with suitable soil and compacting
|
|