UG Pipelines BandarAbbas Gas Condensate Refinery

 

Construction of Underground Pipelines Bandar Abbas Gas Condensate Refinery

 Client:

 Persian Gulf Star Oil Company (PGSOC)

 Contract starting date:

 May 2010

 Contract completion:

 98% Progress

 Contract No.:

 3000000058

 Location:

 Bandar Abbas - Hormozgan

 Pipelines diameters and lengths:

 2 in up to 60 in, 60 km

 

The project comprises construction of underground pipelines in Bandar Abbas gas condensate refinery.

Pipeline diameters vary from 2 in up to 60 in and total lengths are about 60 km. The project is under construction with 95% progress. The Project was held by the Client from May 2010 to March 2011.

Bandar Abbas Gas Condensate Refinery Project will refine 360,000 barrels South Pars gas condensates per day and will produce oil products according to Euro – Standard.

In general the Work shall comprise:

  • Delivery and handling of pipes and other materials within the site.
  • Trench excavation and bedding for the laying of underground networks (piping, cables, sleeves, etc.)
  • Transporting of excavated material to the designated depot place
  • Supply and transport of suitable backfill material into the site
  • Prefab and pipe laying of carbon steel, galvanized, and RTR (GRP) pipelines; installation of valves and other material
  • None destructive tests (NDT), destructive test and PWHT if needed
  • Sandblast and cold wrapping with specified primer of carbon steel and galvanized pipes; painting of carbon steel pipes at AG connections
  • Coating and wrapping of carbon steel  and galvanized pipes at joints and related tests
  •  Leakage tests, hydrostatic tests, pipeline flushing, drying, and other required activities
  • Trench backfilling with suitable soil and compacting
  • Civil activities including (not limited to) reinforcement steel bars, formworks, and concrete placing for man-holes, valve pits, catch basins, and duct banks; laying of precast reinforced concrete slabs
  • Construction of all concrete facilities at U/G pipelines intersections located at lower level and are prior to the U/G pipelines